Our data centre operator GlobalConnect has notified us of their intention to perform service on several components of the the electricity infrastructure in our OSL2 data centre.

Technical personnel from GlobalConnect and their service partner Coromatic will be on-site while the maintenance is in progress.

The maintenance schedule is as follows (all times CET):

* 08:00-11:00: Service on UPS 1. In this period, UPS 2 and 3 will remain on-line. Fault tolerance will be reduced to 2N (normally 3N).
* 11:00-13:30: Service on UPS 2. In this period, UPS 1 and 3 will remain on-line. Fault tolerance will be reduced to 2N (normally 3N).
* 13:30-16:00: Service on UPS 3. In this period, UPS 1 and 2 will remain on-line. Fault tolerance will be reduced to 2N (normally 3N).
Posted Jan 22, 2020 - 15:16 CET